logo图
Home / News

Shenneng Shengteng Science and Technology Industrial Park roof distributed photovoltaic project started smoothly

Release time:2022-10-11     Number of views:82

On September 28, 2022, the opening ceremony of the rooftop distributed photovoltaic project of Shenneng Shengteng Science and Technology Industrial Park was held in Shenshan Special Cooperation Zone, Guangdong. Relevant leaders from Shenzhen Special Zone Construction Engineering Group, Shengteng Technology Co., LTD., construction unit Shenneng Nanjing Energy Holding Co., LTD., supervision unit Zhongda 'an Co., LTD., and general contractor Share Power Co., Ltd. attended the meeting.

The design capacity of the project is 4.24MWp, and the average annual power generation of the system is 4 million KWH. After operation, it can save about 1319.17t of standard coal every year, reduce CO2 emissions about 3196.67t, SO2 emissions about 23.23t, and nitrogen oxide emissions about 34.88t every year. It has positive energy saving, emission reduction and environmental benefits for Shenzhen-Shantou Special Cooperation Zone.

This project is another distributed project of Share Power in Guangdong region, Share Power will continue to build first-class projects, implement first-class management, and create first-class performance as the goal! High starting point, high level, high requirements, clear goals, strengthen responsibility, strictly control the safety, quality and progress of the project, ensure that the construction of the project is put into operation as scheduled, and return the trust and support of the owner and the local government!

Return list

Previous page:2022 Mid-Autumn Festival Potluck for Field in Nanjing and Single Employees

Next page:2022 "Wuyi Mountain . Golden Autumn Tour" activity

(Follow US)