Share Power Solar Power Co., Ltd. is registered with the State Administration for Industry and Commerce.
The company became a member unit of Jiangsu Photovoltaic Industry Association.
DMEGC 20MW Golden Sun Photovoltaic Grid-connected
The company is pleased to be certified by Huaxia Certification Center System.
Shanghai Pudong Airport BIPV project connected to the grid
Huai 'an Liulaozhuang Agricultural Greenhouse Photovoltaic Power Station Grid-connected
Golden Hongye Paper 20 MW Golden Sun PV Power Generation Project successfully connected to the grid and accepted.
The company moved to Building 1, Fengsheng Shanghui, No.119, Software Avenue, Nanjing.
The company signed the installation contract of 40MWp high-efficiency agricultural PV project in Yun County, Hubei Province.
Fujian Nanping Xinyi 50MWp photovoltaic power generation project connected to the grid
The company was certified by the "High-tech Enterprise Certificate"
Anhui Jinzhai Xinyi 0.5MW "Share Power Feiyi" photovoltaic system successfully connected to the grid.
174MWp fishery complementary photovoltaic power station project in Tianjin Huanggang area successfully connected to the grid.
The Party branch of Share Power Solar Power Co., Ltd. was established.
"Nanjing Photovoltaic System Integration Engineering Technology Research Center" was established
Three Gorges new energy Huainan 150MWp surface photovoltaic power generation project is connected to the grid
Chairman Gu Huamin was selected as "Nanjing Innovative Entrepreneur" in 2017.
Entrusted by the association, SHAREPOWER edited the industry standard of Code for Design of Water Photovoltaic Power Generation System.
Share Power Solar Power Co., Ltd. officially changed its name to Share Power Co., Ltd.
Jiangxi Xiushui Meimaoshan 50.6MW wind power project officially started.
Tianjin Binhai Flexible Support Demonstration Project is connected to the grid
Hefei Changan Automobile Phase II 11.98 MW rooftop distributed power generation project commenced.
Entering Africa, the company won the bid for Shenzhen Energy Ansuogu Ghana Photovoltaic Power Generation Project.
The company moved to the 9-2 # building of EPark.
The company successfully signed the roof distributed project of Liudong Passenger Vehicle Base of China Southern Power Grid Integrated Energy.
The company has obtained Grade B design qualification of wind power generation specialty.
The Code for Design of Water Photovoltaic Power Generation System edited by Share Power was selected as the 2020 MIIT Group Standard Demonstration Project.
In cooperation with Jingao, Changde 80MW fishery-solar hybrid photovoltaic power generation project has been started.
The company successfully signed the EPC general contracting project of Huidong Runjia 70MWp Agriculture-solar hybrid photovoltaic power generation project.
Share Power successfully held its 10th anniversary annual meeting.
The company won the bid for Fuyang Phase II 400 MW floating photovoltaic power station project.
The company won the bid for the 80 MW agricultural- fishery -solar hybrid photovoltaic power station project in Baoyan Town of China Energy Jianbi Power Plant.
The company has obtained the Level B Credit Pre-Evaluation Certificate of Engineering Consulting Unit.
The company has obtained the Level II Qualification for Power Engineering Construction General Contracting.
Fuyang Phase II 400 MW floating project connected to the grid with full capacity.
The company has obtained the Level III Certificate for Installation (repair and test) of Electric Power Facilities.
The company successfully signed the general contracting project of Yancheng Clean Energy Binhai Batan 50 MW fishery-solar hybrid photovoltaic project.
The spark of collision between traditional power and emerging photovoltaic is romantic and beautiful, and change and breakthrough are eternal innovations. What awaits us is the harmony between photovoltaic and environment, the mutual promotion between photovoltaic and social development, and the synergy between photovoltaic and human life progress.
Paying attention to customers' needs and providing them with all-round value-added services are the pursuit of SHAREPOWER. Site selection of photovoltaic power station, evaluation of construction resources and conditions, selection of financing scheme and partners, quality schedule control during construction period, professional services connected to power grid, risk identification and prevention during life period, vocational training, operation, big data application, etc. In the multi-dimensional photovoltaic world, the guarantee of customers' interests is the foundation of project success, and achieving win-win is our common goal.
Thank you,distinguished customers! Thank you, dear partner! Thank you for your attention, concern and support! Willing to join hands with you to share low-carbon green energy!
©2022 SHAREPOWER Co., Ltd. All Rights Reserved 苏ICP备16062173号 Post Code:210012 Address: Building 9-2, Yuhua Living Room, No.109 Software Avenue, Nanjing.